They are strategically located and close to the main services. With 16 amps of electricity (European power socket required), equipped with a pit to connect to the water supply and drainage.
1 - 6
7 mt. x 12 mt.
16 amps of electricity
equipped with a pit to connect to the water supply and drainage
Discover our offers and the latest news for an unforgettable stay!